Category solved model papers
Problems associated with geothermal system operations.
6.b) List and explain the problems associated with geothermal system operations. Answer: Problems associated with geothermal system operations: 1. Induced Seismicity (Human‑Caused Earthquakes) 2. Scaling, Corrosion, and Clogging 3. Groundwater…
Construction and working principle of geothermal energy.
6.a) Describe the construction and working principle of geothermal energy with a schematic diagram. Answer: Construction of a Geothermal Power Plant This diagram and explanation offer a comprehensive overview of…
Main considerations in selecting a site for a wind generator.
5.b) Describe the main considerations in selecting a site for a wind generator. Answer: Main Considerations in Selecting a Site for a Wind Generator: Selecting the right site for installing…
Types of windmills and working of Horizontal Axis Wind Machine.
5.a) List the types of windmills. Explain the working of a Horizontal Axis Wind Machine. Answer: Types of Windmills: Windmills are broadly classified into two types based on the orientation…
What are the problems associated with OTEC?
Problems Associated with OTEC 1. Heat Exchangers (Evaporators & Condensers) 2. Biofouling 3. Site Selection 4. Energy Utilization
Write the advantages and limitations of tidal energy.
Advantages of Tidal Energy Limitations of Tidal Energy
With a neat sketch, explain the working principle of a closed-cycle OTEC power station.
Closed-Cycle Ocean Thermal Energy Conversion (OTEC) System A Closed-cycle OTEC system utilizes the temperature difference between warm surface seawater and cold deep seawater to generate electricity. The process involves a…
With a neat sketch, explain a double basin tidal power plant.
Two-Basin System: Working Principle: Co-operating Two-Basin Systems: Co-operating Two-Basin Systems: